Lifestyle

Wil Tower Construction on Schedule

WIL TOWER

Wil Tower, considered as the tallest mixed-use condominium development in Quezon City, gains momentum towards the completion of its first tower on December 2014. An anchor development of Vista Residences, the twin-tower complex has formally opened the four-story commercial atrium last year, ready to offer high-end retail, dining and leisure experiences to would-be residents and the public.

By December 2014, the units—in studio, one-bedroom and two-bedroom configurations—will be available for turnover to investors and residents,” says Elizabeth M. Kalaw, Vista Residences’ Division Head. “Because of Vista Residences’ solid track record in the real estate industry, the units are master planned and offered at prices that are fair to investors.

WIL TOWER

After the turnover of tower 1, tower 2 follows suit

As soon as the first tower is turned over by December 2014, construction for Tower 2 will immediately follow suit. Investors can still look forward to the second tower which will be constructed immediately after the completion of the first tower. Just like its predecessor, Tower 2 will comprise of 42 stories, with the first four floors devoted to the commercial podium. Called Wil Tower Mall, this highlight of the development is the first of its kind in Quezon City to offer a multitude of retail choices—from upscale lifestyle brands to dining destinations such as Draft, Pho Hoa, My Thai Restaurant, Bench Fix, Starbucks and WBR (Wil Bar and Restaurant), among others.

In addition, prospective residents will also enjoy select amenities that include a swimming pool, a fully-fitted gym, a spa, an audio-video room, a game room and a day-care center.

Located along Eugenio Lopez Dr. in Quezon City, Wil Tower sits on the 3,000 sq.m. lot with an uninterrupted view of the surrounding vicinity. Aside from the amenities, the development boasts of an intelligent computer network that will manage and operate building features such as the elevators, security cameras, and fire and electrical systems.

Designed by the US-based, international architectural firm RTKL, with Arch Haus Asia Consultants as local counterpart, Wil Tower is envisioned to combine elegance and modernity in one structure, a showstopper amid the glitz and glam of the area which is home to the two giant networks, ABS-CBN and GMA 7. The interiors gleam with high-class glamour, highlighted by the evocative chandelier by Kenneth Cobonpue located in the atrium lobby, which is comprised of acrylic-cast butterflies that change colors through an LED system and outfitted along lines of hand-hammered steel. This work of art sets Wil Tower’s tone as an embodiment of imaginative sophistication in a city that is emerging as an artistic hub.

Given the location, the design, and the prestige of the project, we knew that our prospective investors and residents would have high expectations,” said Kalaw. We were able to address that by combining topnotch amenities and features within reasonable price points. Add to that, not too many developments can boast of a high-end mall which part and parcel of the project.”

Aside from the amenities, features and the full-fledged commercial component, Wil Tower boasts of the benefits of centralized location. As mentioned, it is in close proximity to leading broadcast networks as well as the well-appointed cafés and fine-dining restaurants of Timog Avenue and Tomas Morato. Wil Tower is mere minutes away from select malls (Trinoma, SM North Edsa, Gateway), hospitals (St. Luke’s Hospital and Capitol Medical Center) and institutions of learning (University of the Philippines, Ateneo de Manila University and Miriam College).

For more information, contact 650-0753 or 0999-887-1705 or check out Vista Residences’ website at www.vistaresidences.com.ph.

Exit mobile version